Mitev, Lubomir2014-07-102014-07-102014-07-01http://hdl.handle.net/123456789/9635Argentina’s Atucha-2 nuclear reactor has been synchronised with the nation’s electricity grid and is likely to be operating at 100 percent power by November 2014, state-owned operator Nucleoeléctrica Argentina SA has said.21573 bytesapplication/pdfenArgentina’s Atucha-2 Connected To GridOther